Applications of soil stabilisation solutions

(1)May, 2014.
Tianjing.
A set of DFMS is processing a wet land.
250000 cube meter sludge, 2 meter deep.
Use cement and lime stabilization of sludge.

soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction
soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction

(2)June, 2015.
Pudong, Shanghai.
A set of WFMS for pipeline base soil stabilization projects.
120000 cube meter of soft soil, 2.5Meters deepth.
Use cement as the soil binder.

soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction
soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction

(3)July 2015.
Jinan, Shandong.
Two sets of WFMS for lake bed project on soil stabilization.
600000 cube meters, 1.5 meter deep.

soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction
soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction
soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction

(4)May 2016.
Hangzhou bay railway bridge soil stabilization project.
300000 cube meters sludge of the riverbed need to be stabilized for road contruction.
11 meters wide,3 meter deep sludge need to be stabilized. DWFS was used with binder of cement and rock powder.

(5)May 2016.
Ningbo, Zhejiang.
About 70000 cubic meter, road subgrade soil stability construction, one side of road is declining because of unstable soft silt underside, contractor decided to use WFMS with cement and rock powder as binder for 1 meter deepth earth stabilization. The stabilizing output is 300 cubic meter per day.

  • soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction
  • soil stabilisation solutions,soil stabilization projects,project on soil stabilization,soil stability construction

The excavator cab is equipped with LED display, which can monitor the status of WFMS system in real time.

soil stabilization system,ground stabilisation systems,earth stabilization systems